Saturday, 30 June 2012

phase 1 complete

we finally finished the office buildings this week.i feel complete, it was a good project and we got most of the work done, so we have council and working drawings if need be. now i look forward to long weekend and getting my school projects done

Monday, 4 June 2012

ZPPA NEW BUILDING DESIGN MEDIA BROADCASTING AND PRESENTATION TO CONTRACTORS AND SPONSORS SHOWING WITH NDILILA ARSCHITECTS

before the big event
project sponsor

zppa owners

big shots in construction and design


our designs

the boss Dr ndilila with contractor China Jinx su


radio station reporters

television reporters with sponsor

television reporters with sponsor

TO THE ENGINEER

So we finally finished the office plan building, after losing the previous work to a virus. i managed to even design it better and found some problems that we wouldn't have noticed. my boss, was happy though she is busy with another project, she didn't have all the time needed to view the design before we sent it to the engineer. I did my first proper foundation and roof plans, I'm learning a lot here and knowing much more. The Makeni shopping mall is stop and go as we are calculating the cost of design for them, the first design i ade for them came to $1.5million which we are lowering for the client, so all the best in negotiations before a deal is struck. as for my private work we are making progress as it seems my client Mr Brux is winning hes Court case for his land. look forward to a week of rest, just finishing the university projects for Monday. until next week bye

Monday, 28 May 2012

sad week

the week started out well, i basically was like superman, on the office buildings, because i was done within two days, but the trouble only started, when i had began working on my community hub project. since that was giving me a hard time, i must have been absent mined, with the long weekend looming. the whole office project got corrupted and couldn't open. i had to rush in the office on Saturday and get the blue print to start from scratch, i defiantly wont be getting any sleep this weekend. until Monday

Saturday, 19 May 2012

back to the drawing board

so OK the office project was almost 50% done, but my boss was not happy with what she designed, so she said delete all the previous work and start from scratch, we phoned the right people and put ideas together, before she had a late night at the office, on Friday she pitched the latest plan to me. that means on Monday after she develops  it a little bit more, i must take over, and get it done. on another note the makeni project clients are in the country, luckily for us i moved fast in the design, now its all about square meters and cost, my boss was impressed with the plan and possible elevation i pitched her, but we argued on the fact that the client has such a low budget, but we will push ahead and try to reduce cost in need be, I'm hopping the client does not change her mind on the before brief, because the plan is suited for that brief. except for contractors on the battle front with us, we also manage to submit the bid for the new bank of Zambia that all the firms are fighting for, although our package was small, size doesnt matter compared to quality, and  fi did her best on that project even though shes new. so until next week

Monday, 14 May 2012

Architectural process in practice

well started working on the elevations of the office building again, we trying out new looks, and been in constant talks with our suppliers on materials. the makeni shopping mall has had to take a back seat for now. after i finished the four types of elevations it was back to the makeni project where we hard run into some trouble concerning the roof support that runs through the clinic, one one side, the flats are good to go, just some changes here and there and we good to go, enjoy work now, but i want more, cant wait for next week

learning week

the week started off fantastic. the makeni shopping complex is coming along very well. just some concerns on the roof and how it will come about, since its a low cost project, i would prefer to use a more modern way of construction. learned some interesting ways of construction, hopefully the next week we can proceed to the full sections and elevations