Saturday 19 May 2012

back to the drawing board

so OK the office project was almost 50% done, but my boss was not happy with what she designed, so she said delete all the previous work and start from scratch, we phoned the right people and put ideas together, before she had a late night at the office, on Friday she pitched the latest plan to me. that means on Monday after she develops  it a little bit more, i must take over, and get it done. on another note the makeni project clients are in the country, luckily for us i moved fast in the design, now its all about square meters and cost, my boss was impressed with the plan and possible elevation i pitched her, but we argued on the fact that the client has such a low budget, but we will push ahead and try to reduce cost in need be, I'm hopping the client does not change her mind on the before brief, because the plan is suited for that brief. except for contractors on the battle front with us, we also manage to submit the bid for the new bank of Zambia that all the firms are fighting for, although our package was small, size doesnt matter compared to quality, and  fi did her best on that project even though shes new. so until next week

No comments:

Post a Comment