Monday, 28 May 2012
sad week
the week started out well, i basically was like superman, on the office buildings, because i was done within two days, but the trouble only started, when i had began working on my community hub project. since that was giving me a hard time, i must have been absent mined, with the long weekend looming. the whole office project got corrupted and couldn't open. i had to rush in the office on Saturday and get the blue print to start from scratch, i defiantly wont be getting any sleep this weekend. until Monday
Saturday, 19 May 2012
back to the drawing board
so OK the office project was almost 50% done, but my boss was not happy with what she designed, so she said delete all the previous work and start from scratch, we phoned the right people and put ideas together, before she had a late night at the office, on Friday she pitched the latest plan to me. that means on Monday after she develops it a little bit more, i must take over, and get it done. on another note the makeni project clients are in the country, luckily for us i moved fast in the design, now its all about square meters and cost, my boss was impressed with the plan and possible elevation i pitched her, but we argued on the fact that the client has such a low budget, but we will push ahead and try to reduce cost in need be, I'm hopping the client does not change her mind on the before brief, because the plan is suited for that brief. except for contractors on the battle front with us, we also manage to submit the bid for the new bank of Zambia that all the firms are fighting for, although our package was small, size doesnt matter compared to quality, and fi did her best on that project even though shes new. so until next week
Monday, 14 May 2012
Architectural process in practice
well started working on the elevations of the office building again, we trying out new looks, and been in constant talks with our suppliers on materials. the makeni shopping mall has had to take a back seat for now. after i finished the four types of elevations it was back to the makeni project where we hard run into some trouble concerning the roof support that runs through the clinic, one one side, the flats are good to go, just some changes here and there and we good to go, enjoy work now, but i want more, cant wait for next week
learning week
the week started off fantastic. the makeni shopping complex is coming along very well. just some concerns on the roof and how it will come about, since its a low cost project, i would prefer to use a more modern way of construction. learned some interesting ways of construction, hopefully the next week we can proceed to the full sections and elevations
Monday, 30 April 2012
stw community hub
Community
Hub - Naphtali Mphaisha
Concept-
Natural geometric shapes, that co-respond to their function and context. Making
it easier for a community to unit and co-exist freely.
Design-
The geometric shapes allow the construction technology to become subdue and
clear to construct. The concept consists of five (5) individual components that
come together to form one unit. Firstly, the internet tower. The tower is
accessible through-out the day and night, including a safety gate. It will
allow seating for social gatherings and networking. The second and third parts
are made up of curved structures that resemble arms, and are positioned on
either side of the tower. These structures act as an open plan seating area
that allows visible sight all around the main structure. The idea for this
structure is to enforce a logical social gathering during functions such as
performances that could possible take place or too just casually sit and have
lunch. The fourth structure is the stage. It is carefully placed in such a way
that you can view it from the tower or curved seating area. This makes sure
that the area is served as a public space. The fifth and last structure
resembles a sort of chalet, but with semi open wall structures. This will be
known as the meeting or studying area, as the noise level will be buffered by
the brick tower. Making sure that if there is a performance on stage, you can
still have a little privacy. The whole structure is designed in such a way as
to allow as much seating as possible, using building material as furniture,
while providing protection from the elements. The roofs are held up by gum poles and connectors. This will provide the addition to
the urban fabric, a tower simple in its design and construction, that it is
suitable for any environment.
concept model, advanced.
stwv community hub precedent study
Community
hub precedent study
Naphtali
Mphaisha 211038547
CPUT
2nd year STW and CTD project
COMMUNITY HUB –PHILIP DANIEL
CONRADE
POAD 2010 REF NO. 207006717
Concept/
Plan/ Joinery and Development.
Sections
and Elevations
Working
models
FUNCTIONAL
PRECEDENT
-
What
is the main technological idea of the structure/building
Conradie used gum poles, concrete, and brick
to create an outdoor like experience for this community hub. The poles are connecting
with the use of pole connecters to provide the primary structure. The secondary
structure is connected in such a way that it provides stability, but also acts
as a roof, floor and natural furniture. Concrete foundations lay underground,
which the bottom of the primary poles are casted into. The walkway is concrete
and leads to the brick tower. The size of the whole hub is important as it
relates to scale of the concept and idea of my own community hub.
-
How
does the technological idea contribute to the overall idea of the structure
Intent- Philip Daniel Conradie:” The project
requests the creation of a community hub, a place promoting social interaction,
education and entertainment. The intent is to create a place where this
culmination of different functions can merge into an interesting addition to
the urban fabric an addition which blends into context”.
Concept- Philip Daniel Conradie:” An
epicentre, a landmark, a knot in the contextual fabric from where information
bulges and explodes outwards. Always learning. Always growing.
Friday, 27 April 2012
good week
well the shopping complex looks like its coming alone very well, although i miss Monday with a flu, i managed to spend my time in bed coming up with new ideas and it helped. worried about some angels cause of the wasted space but the site plan forces me to design at an angel. the flats are done and the clinic too. just adjustments to the shopping floor plan and we can take it to review hopefully on Monday i can start the sections and elevation, i still haven't thought about the roof plan yet. anyway on a separate thought i spent the time at home cleaning the roof and fixing the gutters, down pipes and seen more architecture techniques. was a bit scared of been so high without a safety net but we managed till late at night. we also managed to find the missing plans for the new house my father building, and got them to council this morning, and unfortunately my client is still fighting in court for his land, but the drawings i did for him are ready. oh yes and the bosses are back from vacation, so the office is buzzing with orders and work again, i printed the new office plans i had done for review and we will discuss the next step next week...for now I'm looking forward to the weekend so until next Friday bye!!!!!!!!!!!!!
Subscribe to:
Posts (Atom)














