Monday, 14 May 2012
learning week
the week started off fantastic. the makeni shopping complex is coming along very well. just some concerns on the roof and how it will come about, since its a low cost project, i would prefer to use a more modern way of construction. learned some interesting ways of construction, hopefully the next week we can proceed to the full sections and elevations
Monday, 30 April 2012
stw community hub
Community
Hub - Naphtali Mphaisha
Concept-
Natural geometric shapes, that co-respond to their function and context. Making
it easier for a community to unit and co-exist freely.
Design-
The geometric shapes allow the construction technology to become subdue and
clear to construct. The concept consists of five (5) individual components that
come together to form one unit. Firstly, the internet tower. The tower is
accessible through-out the day and night, including a safety gate. It will
allow seating for social gatherings and networking. The second and third parts
are made up of curved structures that resemble arms, and are positioned on
either side of the tower. These structures act as an open plan seating area
that allows visible sight all around the main structure. The idea for this
structure is to enforce a logical social gathering during functions such as
performances that could possible take place or too just casually sit and have
lunch. The fourth structure is the stage. It is carefully placed in such a way
that you can view it from the tower or curved seating area. This makes sure
that the area is served as a public space. The fifth and last structure
resembles a sort of chalet, but with semi open wall structures. This will be
known as the meeting or studying area, as the noise level will be buffered by
the brick tower. Making sure that if there is a performance on stage, you can
still have a little privacy. The whole structure is designed in such a way as
to allow as much seating as possible, using building material as furniture,
while providing protection from the elements. The roofs are held up by gum poles and connectors. This will provide the addition to
the urban fabric, a tower simple in its design and construction, that it is
suitable for any environment.
concept model, advanced.
stwv community hub precedent study
Community
hub precedent study
Naphtali
Mphaisha 211038547
CPUT
2nd year STW and CTD project
COMMUNITY HUB –PHILIP DANIEL
CONRADE
POAD 2010 REF NO. 207006717
Concept/
Plan/ Joinery and Development.
Sections
and Elevations
Working
models
FUNCTIONAL
PRECEDENT
-
What
is the main technological idea of the structure/building
Conradie used gum poles, concrete, and brick
to create an outdoor like experience for this community hub. The poles are connecting
with the use of pole connecters to provide the primary structure. The secondary
structure is connected in such a way that it provides stability, but also acts
as a roof, floor and natural furniture. Concrete foundations lay underground,
which the bottom of the primary poles are casted into. The walkway is concrete
and leads to the brick tower. The size of the whole hub is important as it
relates to scale of the concept and idea of my own community hub.
-
How
does the technological idea contribute to the overall idea of the structure
Intent- Philip Daniel Conradie:” The project
requests the creation of a community hub, a place promoting social interaction,
education and entertainment. The intent is to create a place where this
culmination of different functions can merge into an interesting addition to
the urban fabric an addition which blends into context”.
Concept- Philip Daniel Conradie:” An
epicentre, a landmark, a knot in the contextual fabric from where information
bulges and explodes outwards. Always learning. Always growing.
Friday, 27 April 2012
good week
well the shopping complex looks like its coming alone very well, although i miss Monday with a flu, i managed to spend my time in bed coming up with new ideas and it helped. worried about some angels cause of the wasted space but the site plan forces me to design at an angel. the flats are done and the clinic too. just adjustments to the shopping floor plan and we can take it to review hopefully on Monday i can start the sections and elevation, i still haven't thought about the roof plan yet. anyway on a separate thought i spent the time at home cleaning the roof and fixing the gutters, down pipes and seen more architecture techniques. was a bit scared of been so high without a safety net but we managed till late at night. we also managed to find the missing plans for the new house my father building, and got them to council this morning, and unfortunately my client is still fighting in court for his land, but the drawings i did for him are ready. oh yes and the bosses are back from vacation, so the office is buzzing with orders and work again, i printed the new office plans i had done for review and we will discuss the next step next week...for now I'm looking forward to the weekend so until next Friday bye!!!!!!!!!!!!!
Friday, 20 April 2012
week 8:kicking it old school with my nose in the books:)
So dear readers, all reader here we are again, been working for 8 weeks now, but it feels like 2 months LOL, just a little joke.
OK so the bosses are still on vacation right, but that doesn't mean the workforce can play, or does it, anyway, I have been given something that is suppose to keep my mind turning for days, with a design process. the clients brief is asking me to design a shopping complex / clinic / staff flats on one plot, which is about 5000m squared. so i think I have read about 100 books for research on this proposal, some of them that literally put me so sleep in my desk. but after all is said and done, i dot the general idea and went to work, My supervisor gave me the green light, and said the layout was well thought of and good, "thank you books, i guess". now it was time for the parking, and according to parking standards, we needed 77 bays for our site and we had 65, big problem , but some thought, and a little magic, and we ended up with 78 bays ( by the way we went parallel on on side of the mall). once again my supervising boss gave me the thumbs up. so now we can start making the magic happen on the computer. one thing I'm stressing about is designing at an angle, because the site is angled, but still i cant wait, look out Zambia, Naphtali Mphaisha is designing a mall ho ha, watch this space.
so until next week, this is me signing out and wishing everyone a good weekend and well deserved rest
bye!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
OK so the bosses are still on vacation right, but that doesn't mean the workforce can play, or does it, anyway, I have been given something that is suppose to keep my mind turning for days, with a design process. the clients brief is asking me to design a shopping complex / clinic / staff flats on one plot, which is about 5000m squared. so i think I have read about 100 books for research on this proposal, some of them that literally put me so sleep in my desk. but after all is said and done, i dot the general idea and went to work, My supervisor gave me the green light, and said the layout was well thought of and good, "thank you books, i guess". now it was time for the parking, and according to parking standards, we needed 77 bays for our site and we had 65, big problem , but some thought, and a little magic, and we ended up with 78 bays ( by the way we went parallel on on side of the mall). once again my supervising boss gave me the thumbs up. so now we can start making the magic happen on the computer. one thing I'm stressing about is designing at an angle, because the site is angled, but still i cant wait, look out Zambia, Naphtali Mphaisha is designing a mall ho ha, watch this space.
so until next week, this is me signing out and wishing everyone a good weekend and well deserved rest
bye!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
Friday, 13 April 2012
slow week
OK so the boss lady is in Germany for two weeks, but the plans have been done, the week has been slow, but it should pick up next week with some new projects possibly coming up, as for now, I'm looking forward to a good rest this weekend. stressing a little cause of the lack of contact from the CPUT, but I'm sure all completed work was submitted. On another note got introduced to the new Miss Zambia this week, we might be doing some work for her, so that was pretty fun, different and interesting. anyway I'm done for the week, this is me signing out, have a good weekend everyone reading.
Wednesday, 11 April 2012
week 6, losing my mind in a new work place
having a good week, after the Easter break, just finished part one of the drawings for council, now the boss has to get back to me, looking forward to more work this week, and i got showed how to finally fold plans the right way by Mr wachata. hopefully that skill will came in hand soon, as we were folding what seemed like hundred's of plans, late Thursday afternoon, when the electricity went off, due to other buildings playing with cables lol.
Subscribe to:
Posts (Atom)